DETAILS OF OUR PROJECT

LIST OF 500KV PROJECTS COMPLETED

SR. NO.
NAME OF WORK
YEARCLIENTCONTRACT VALUEREMARKS
1.500 KV Guddu-Jamshoro 3rd Circuit T/Line Conventional and Pile Foundations.1996-97Chico (WAPDA)24.00 Millions

M/s NESPAK

Approved Sub Contractor

2.Addition of 500 KV Tower No.172A in Span GD (172-173)  Indus High way near Ghouspur (Deposit work)1998-98

WAPDA

1.60 Millions

Main Contractor

(J.V)

3.500 KV Lahore-Multan T/Line Break Down at Tower No. 335 to 344 Near Mandi Faizabad.2002WAPDA \ Potential4.3 Millions

Subcontractor

M/s Potential

4.500kv Lahore-Multan T/Line Break down at T/No. 79,80,81&82 foundation, tower erection & stringing work.2002WAPDA\ M/s ICC2.0 Millions

Subcontractor

M/s ICC

5.Relocation of 500kv Terbela-Gatti T/line at Faisalabad (In Progress)2004NTDC  WAPDA3 Million

Main

Contractor

6.500Kv Muzaffargarh-Gatti T/L2006CCC/ WAPDA80 Millions

Subcontractor

M/s CCC

7.500KV Single circuit SGM Type Tower with 500KV Rousch – Gatti T/Line due to rehabiliation work at Toba Rajana – Kanalia Section2008EHV / WAPDA0.8 Millions

Main

Contractor

8.500KV Over head Power T/Line from Muzaffargarh to Gatti S/S extension MG-1 (Package I)2008CCC /  WAPDA12 Millions

Subcontractor

M/s CCC

9.Raising of High tension line 500KV at Gatti – Barotha circuit 2nd between Tower 796 – 801 for FIED MC2008NTDC /  WAPDA2.6 MillionsMain Contractor
10.Breakdown Tower # 65 500KV Terbela – Peshawar T/Line Damaged on 18.04.092009GSO NTDC2 MillionsMain Contractor
11.Breakdown Tower # 288 500KV Terbela – Peshawar T/Line Damaged on 17.04.092009GSO NTDC2 MillionsMain Contractor
12.Breakdown Tower # 294 500KV Terbela – Peshawar T/Line2009GSO NTDC2.19 MillionsMain Contractor
13.Breakdown Tower # 292 500KV Terbela – Peshawar T/Line2009GSO NTDC2 MillionsMain Contractor
14.Breakdown Tower # 328 500KV Terbela – Peshawar T/Line + Tower # 10 & 11 Peshawar – Daud Khel T/Line2008GSO NTDC2.35 MillionsMain Contractor
15.Breakdown Tower # 331 500KV Terbela – Peshawar T/Line2008GSO NTDC2.045 MillionsMain Contractor
16.Pile Foundation Works at 500kv Ghazi – Barotha Substation2013M/s CNEEC2 MillionSubcontractor M/s CNEEC
17.500KV Guddu – Multan I/O at D.G Khan Substation.2014M/s CCPG180 MillionSubcontractor M/s CCPG
18.500kv Lahore – Gatti S/C T/Lines At 500kv Switchyard of CCPP Bhikki2016NTDC / WAPDA47.98 MillionMain Contractor
19.500kv Yousafwala – Lahore S/C T/Lines At 500kv Switchyard of Sahiwal Coal P/Plant2017NTDC / WAPDA29.8 MillionMain Contractor
20.500KV Transmission Line from Port Qasim Power Plant To Interconnection with existing 500KV S/C Hub – Jamshoro T/Line.2017M/s ICC6.8 MillionSubcontractor M/s ICC
21.500kv Neelum – Jhelum Transmission Line (Lot-II)2014M/s Potential126.27 MillionSubcontractor M/s Potential
22.500kv 3RD Jamshoro – Moro – Dadu To Rahim Yar Khan T/Line (Jamhsoro – Moro Section)2015M/s CNEEC50 MillionSubcontractor M/s CNEEC
23.500KV Gakhar – Lahore Transmission Line At New Lahore Substation. (Lot-IB)2016M/s CCPG175 MillionSubcontractor M/s CCPG
24.500KV T/Line Hubco Power Plant to Existing 500KV Jamshoro Grid Station2019M/s Potential48.22 MillionSubcontractor M/s Potential