Our Projects
Our Work
- 132 KV & Above Capacity
- 132 KV Projects
- 220 KV Projects
- 500 KV Projects
- 660 KV Projects
DETAILS OF OUR PROJECT
LIST OF SURVEY WORKS CONDUCTED
| Sr. No. | NAME OF WORK | YEAR | CLIENT |
| 1. | Survey works on 132kv Kotli-Rawla Kot T/line (55km) | 1994 | M/S Potential Engineers (Pvt) Ltd. |
| 2. | Route Alignment detail survey preparation of line plan and profile work of 220kv Mangla-Ghakkar T/line (115km) | 1995 | M/S ICC (Pvt) Ltd |
| 3. | Route Alignment detail survey preparation of line plan and profile work of 220kv Muzaffargarh-Bhawalpur T/line (108-km) | 2002 | M/s SEPC |
| 4. | Confirmatory / coordinating survey of 220kv Shikarpur IN & OUT Guddu Sibbi T/line. (37-km) | 2002 | M/S SEPC |
| 5. | Route Alignment detail survey preparation of line plan and profile work of 220kv Peshawar Shahibagh T/line (30km) | 2002 | M/S ICC (Pvt) Ltd |
| 6. | Route Alignment detail survey preparation of line plan and profile work of 220kv Brotha-Nowshera Industrial-Shahi Bagh T/line. (84km) | 2003 | M/S ICC (Pvt) Ltd |
| 7. | Confirmatory / coordinating survey of 500kv DG Khan T/Line I/O at 500Kv Guddu – Multan (28-km) | 2011 | M/S CCPG |
| 8. | Confirmatory / Coordinating survey of 220kv D.I.Khan – Zhob T/Line Lot-I. (217-km) | 2019 | M/S SA-RA |
LIST OF WORKS COMPLETED
| SR. NO. | NAME OF WORK | YEAR | CLIENT | CONTRACT VALUE | REMARKS |
| 1. | 500 KV Guddu-Jamshoro 3rd Circuit T/Line Conventional and Pile Foundations. | 1996-97 | Chico (WAPDA) | 24.00 Millions | M/s NESPAK Approved Sub Contractor |
| 2. | 220 KV Muzarffargarth – AES Lalpir T/Line Foundation Concrete work. | 1997-98 | WAPDA | 8.5 Millions | Main Contractor |
| 3. | Construction of RCC Pile Foundation SM-I Towers in Sutluj River Crossing of 11 KV PLUA Feeder from 66/11 KV Kanganpur Grid Station. | 1997-98 | WAPDA | 4.50 Millions | Main Contractor |
| 4. | Addition of 500 KV Tower No.172A in Span GD (172-173) Indus High way near Ghouspur (Deposit work) | 1998-98 | WAPDA | 1.60 Millions | Main Contractor (J.V) |
| 5 | Construction of R.CC Pile Foundation for steel poles and tower foundations for In & Out of 132kv S/C Wazirabad-Sialkot T/Line at 220/132kv Sialkot new Grid Station. | 1998 | WAPDA | 1.00 Millions | Main Contractor |
| 6. | 132 KV Chakwal – Choa Saiden Shah T/Line Foundation work. | 1998-99 | WAPDA | 11.5 Millions | Main Contractor |
| 7. | Erection of 2 No (EB + 0 + 12) type Towers and conductor stringing on 132 KV Chashma-wan Bhachran T/Line. | 2000 | WAPDA | 1.60 Millions | Main Contractor |
| 8. | Construction of Pile foundation rehabilitation of Rerizpur road shifting of 132kv tower near green town grid station (Deposit Work) | 2000 | WAPDA | 0.30 Millions | Main Contractors |
| 9. | 220kv Grid station Shikarpur equipment foundation Civil and erection work complete. | 1998-2000 | M/s Potential | 22.5 Millions | Petty Contractor M/s Potential |
| 10. | Construction of Pile Foundation for Tower No. 94 at 132 KV S/C T/Lion Right Bank Tarbela at GBHP. | 2001 | WAPDA | 2.77 Millions | Main Contractor |
| 11. | Construction of R.CC Pile Foundation for tubler poles and tower foundations for 132kv S/C from Kasur Grid Station to Khuddin Grid Station T/Line. | 2001 | WAPDA | 03.90 | Main Contractor |
| 12 | 132kv from 500 KV Grid Station to Shah Kot T/line Foundation Concrete work. | 2001-2002 | WAPDA | 3.7 Millions | Main Contractor |
| 13. | 220 KV Gatti – Luddewala T/Line Foundation Concrete work Towers Erection work and Stringing of Conductor complete job. | 2002-2004 Under Progress | SEPC/ WAPDA | 41.5 Millions | M/s NESPAK Approved Subcontractor |
| 14. | 220kv Daud Khel – Bannu 220 KV Transmission Line – 1 foundation concrete work. | 2003-2004 | SEPC/ WAPDA | 11.0 Millions | M/s NESPAK Approved subcontractor |
| 15. | 220kv Muzaffargarh-Bahawalpur T/Line Foundation concrete work and 10kms stringing work. | 2003-2004 | SEPC/ Wapda | 14.0 Millions | M/s NESPAK Approved subcontractor |
| 16. | Survey and preparation of plane and profile of 220kv T/lines Gatti-Luddewala, Muzaffargarh-Bahawalpur, Nowshera-Shahi Bagh | 2003-2005 | SEPC & ICC | 2.0 Million | M/s NESPAK Approved subcontractor |
| 17. | 220kv Guddu-DM Jamali-Sibbi Transmission Lines break down. | July 2003 | WAPDA | 3 Millions | Main Contractors |
| 18. | Erection of 2 Nos. (EB +0+12) Towers & Stringing from Location No.121 to Gantry of Chashma hep of 132 KV D/C Chashama hep van Buchran. | 2001 | WAPDA | 1.69 Millions | Main Contractors |
| 19. | Stringing of 132 KV T/Line Abbottapad-Nathiagali from Location No. 44 to 59. | 2001 | WAPDA | 0.4 Millions | Main Contractors |
| 20. | Emergency Work on 132 KV Muzaffarabad – Jagran T/Line Under Hydro Electric Board Muzaffarabad Azad Kashmir. | 2002 | HEB AJK | 0.50 Millions | Main Contractors |
| 21. | Stringing of Conductor at 132 KV Guddu – Guddu left at Indus River Crossing (Emergency Work of G.S.O). | 2001 | WAPDA | 0.82 Millions | Main Contractors |
| 22. | 500 KV Lahore-Multan T/Line Break Down at Tower No. 335 to 344 Near Mandi Faizabad. | 2002 | WAPDA \ Potential | 4.3 Millions | Subcontractor M/s Potential |
| 23. | 500kv Lahore-Multan T/Line Break down at T/No. 79,80,81&82 foundation, tower erection & stringing work. | 2002 | WAPDA\ M/s ICC | 2.0 Millions | Subcontractor M/s ICC |
| 24. | 220 KV Transmission Line Break Down Sibi – Dera Murad Jamali. | 2003 | WAPDA | 3.4 Million | Main Contractor |
| 25. | 220kv Pesh-Daudkhel T/line breakdown T/No. 93 and 167 foundation, erection & stringing work and 132kv Kohat-Bannu T/Line T/No. 136 (Zm-30). | 2004 | WAPDA | 2.0 Million | Main Contractor |
| 26. | Relocation of 500kv Terbela-Gatti T/line at Faisalabad (In Progress) | 2004 | NTDC WAPDA | 3 Million | Main Contractor |
| 27. | Construction of 220kv foundation at Rewat for interfacing | 2005 | NTDC WAPDA | 2 Million | Main Contractor |
| 28. | 500Kv Muzaffargarh-Gatti T/L | 2006 | CCC/ WAPDA | 80 Millions | Subcontractor M/s CCC |
| 29. | Construction of Tower Foundation at 132KV T/Line of Sangjani – KTM (Remodeling) | 2007 | IESCO / WAPDA | 14 Millions | Main Contractor |
| 30. | 500KV Single circuit SGM Type Tower with 500KV Rousch – Gatti T/Line due to rehabiliation work at Toba Rajana – Kanalia Section | 2008 | EHV / WAPDA | 0.8 Millions | Main Contractor |
| 31. | 500KV Over head Power T/Line from Muzaffargarh to Gatti S/S extension MG-1 (Package I) | 2008 | CCC / WAPDA | 12 Millions | Subcontractor M/s CCC |
| 32. | Malakand Power House Project Civil & Electrical work of 132KV Switch yard along with 132KV T/Line | 2008 | CCPG / WAPDA | 2.2 Millions | Subcontractor M/s CCPG |
| 33. | Breakdown of 220KV D/C Peshawar – Daud Khel T/Line at Tower # 120 due to sabotage/blast | 2008 | NTDC / WAPDA | 1.6 Millions | Main Contractor |
| 34. | 3 Nos. JKD type Towers Erection and Stringing work at Muzaffargarh at 220KV Grid Station | 2008 | WAPDA | 4.6 Millions | Main Contractor |
| 35. | Malakand – III Hydro Power Project 132KV Substation and T/Line Construction of foundation and stringing Works | 2008 | CCPG / WAPDA | 31 Millions | Subcontractor M/s CCPG |
| 36. | Breakdown of 220KV D/C Peshawar – Daud Khel T/Line at Tower # 159 due to sabotage/blast | 2008 | NTDC / WAPDA | 1.35 Millions | Main Contractor |
| 37. | Breakdown of 220KV D/C Peshawar – Daud Khel T/Line at Tower # 146 due to sabotage/blast | 2008 | NTDC / WAPDA | 0.95 Million | Main Contractor |
| 38. | Breakdown of 220KV D/C Peshawar – Daud Khel T/Line at Tower # 99 due to sabotage/blast | 2008 | NTDC / WAPDA | 1.5 Millions | Main Contractor |
| 39. | Breakdown of 220KV D/C Peshawar – Daud Khel T/Line at Tower # 98 due to sabotage/blast | 2008 | NTDC / WAPDA | 0.975 Million | Main Contractor |
| 40. | Rehabiliation of Tower # 32, 33, 34 & 35 and addition of New Tower # 33A at 220KV T/Line from 500KV Grid Station | 2008 | NTDC / WAPDA | 4.9 Millions | Main Contractor |
| 41. | Rehabiliation of Tower # 27 at 220KV D/C T/Line New Multan NGPS Piran Ghaib | 2008 | NTDC / WAPDA | 1.7 Millions | Main Contractor |
| 42. | Stringing of Towers due to Breakdown of 220KV Sarfraznagar – Yousafwala T/Line | 2008 | NTDC / WAPDA | 1.2 Millions | Main Contractor |
| 43. | Raising of High tension line 500KV at Gatti – Barotha circuit 2nd between Tower 796 – 801 for FIED MC | 2008 | NTDC / WAPDA | 2.6 Millions | Main Contractor |
| 44. | 220KV Double Circuit Tower bundle T/Line F/F Atlas Power House Shiekhupura | 2008 | EHV / WAPDA | 19 Millions | Main Contractor |
| 45. | Feeds for Saif Power Plant at Sahiwal IN / OUT from 132KV Yousafwala – Okara Cantt and 132KV Qadirabad – Saif Power Plant T/Line | 2008 | EHV / WAPDA | 9 Millions | Main Contractor |
| 46. | 220KV Mangla Power House T/Line Emergency | 2009 | NTDC / WAPDA | 20 Millions | Subcontractor M/s Potential Engineers |
| 47. | SKP – BDR CCT III 220KV Grid Station Ravi Stringing Tower # 22 – 26 | 2010 | GSO NTDC | 0.9 Millions | Main Contractor |
| 48. | Breakdown Tower # 65 500KV Terbela – Peshawar T/Line Damaged on 18.04.09 | 2009 | GSO NTDC | 2 Millions | Main Contractor |
| 49. | Breakdown Tower # 288 500KV Terbela – Peshawar T/Line Damaged on 17.04.09 | 2009 | GSO NTDC | 2 Millions | Main Contractor |
| 50. | Breakdown Tower # 294 500KV Terbela – Peshawar T/Line | 2009 | GSO NTDC | 2.19 Millions | Main Contractor |
| 51. | Breakdown Tower # 292 500KV Terbela – Peshawar T/Line | 2009 | GSO NTDC | 2 Millions | Main Contractor |
| 52. | Breakdown Tower # 328 500KV Terbela – Peshawar T/Line + Tower # 10 & 11 Peshawar – Daud Khel T/Line | 2008 | GSO NTDC | 2.35 Millions | Main Contractor |
| 53. | Rehabilitation Work of Tower # 62 & 63 220KVPeshawar – Daud Khel T/Line | 2008 | GSO NTDC | 2.085 Millions | Main Contractor |
| 54. | Breakdown Tower # 331 500KV Terbela – Peshawar T/Line | 2008 | GSO NTDC | 2.045 Millions | Main Contractor |
| 55. | 220KV HIC – I for Construction of T/Line Hydro Power Project Duber Khawar Khan Khawar & Allai Khawar River Indus (Lot I & II) | M/s NEIE Contract Agreement | NEIE / WAPDA | 21 Millions | Subcontractor M/s NEIE |
| 56. | 132KV Tajazai – Pezu T/Line Tower Foundation (Location 01 – 76) | 2008 | NTDC / WAPDA | 7.7 Millions | Main Contractor |
| 57. | 132KV Feed for Karak Grid Station (IN/OUT) Kohat – Bannu T/Line | 2008 | NTDC / WAPDA | 2.6 Millions | Main Contractor |
| 58. | 132KV D/C Sarfraznagar – Kasur (Lot – II) Reconductoring. Foundations of Poles SPA, SPD & SPG | 2008 | NTDC / WAPDA | 6.7 Million | Main Contractor |
| 59. | 132KV KalaShah Kaku – Narowal In & Out SC + DC | 2009 | NTDC / WAPDA | 3.9 Million | Main Contractor |
| 60. | Concreting of poles (Type SPA) and Stringing of 2nd Circuit of 132KV Transmission Line (Kala Shah Kaku) Narang STD Line on LYNX Conductor | 2010 | GSC LESCO | 6.0 Million | Main Contractor |
| 61. | Stringing Breakdown 220KV SKP – BDR CCT – III 220KV Grid Station Ravi | 2010 | NTDC / WAPDA | 0.9 Million | Main Contractor |
| 62. | Rehabilitation work of 220KV Guddu – Sibbi Stringing work at Tower # 448 – 459 | 2010 | NTDC / WAPDA | 1.8 Million | Main Contractor |
| 63. | Break down at 220KV Guddu – Sibbi T/Line at Location # 513 (H – Pole) | 2010 | NTDC / WAPDA | 1.3 Million | Main Contractor |
| 64 | Rehabilitation work at Tower # 260 220KV Sarfraznagar – Yousafwala T/Line Stringing Work | 2010 | NTDC / WAPDA | 0.2 Million | Main Contractor |
| 65 | Stringing Breakdown due to Lightening at Location # 332 – 336 220KV MNG – Ghakkar T/Line | 2010 | NTDC / WAPDA | 2.0 Million | Main Contractor |
| 66 | 220 KV Rohri New Grid Station to 220 KV Shikarpur Grid Station | M/s Potential Contract Agreement | M/s Potential / WAPDA | 12 Million | Subcontractor M/s Potential |
| 67 | 132 KV In & Out at HABCO Power Plant Narowal | 2009 | NTDC / WAPDA | 13 Million | Main Contractor |
| 68 | 132KV Liberty Power Tech. Plant to Nishatabad up to existing Location # 259 of Nishatabad – Chiniot Ind / Sargodha T/Line (Incoming) | 2010 | NTDC / WAPDA | 12 Million | Main Contractor |
| 69 | 132KV Liberty Power Tech. Plant to Chiniot Ind / Sargodha – II up to existing Location # 240 of Nishatabad – Chiniot Ind / Sargodha T/Line (Outgoing) | 2010 | NTDC / WAPDA | 9.4 Million | Main Contractor |
| 70 | 220KV D/C for In & Out of One circuit of Gatti – Kalashah Kaku Transmission Line at 220KV Bandala Substation | 2009 | NTDC / WAPDA | 37 Million | Main Contractor |
| 71 | Construction of Mansehra New – Islamabad Peshawar Road 220KV Double Circuit Twin Bundle T/Line | M/s I.C.C Contract Agreement | M/s I.C.C | 14 Million | Subcontractor M/s I.C.C |
| 72 | In & Out 132KV DC T/Line Aroop – Pasroor Road to Nandipur Power Plant | 2010 | NTDC / WAPDA | 12 Million | Main Contractor |
| 73 | In & Out from 132KV Bund Road – Chung T/Line (Loc # 66 – 81 & 91 – 208) | 2010 | NTDC / WAPDA | 18 Million | Main Contractor |
| 74 | 220KV Mardan Transmission Line. | 2011 | M/s Potential | 2 Million | Subcontractor M/s Potential |
| 75 | 220KV Shalamar – Ghazi Road Transmission Line Rehabilitation Work at Tower # 1, 2, 3 & 4. One JKD & Three EA Type Towers. | 2012 | NTDC / WAPDA | 4.7 Million | Main Contractor |
| 76 | 220KV Shalamar – Ghazi Road T/Line B/Down Piling & Pile Cap Work at JKD Type Tower # 02 | 2012 | NTDC / WAPDA | 5 Million | Main Contractor |
| 77 | 220KV Loralai – Dera Ghazi Khan Transmission Line | 2012 | M/s Potential | 8 Million | Subcontractor M/s Potential |
| 78 | 220KV Twin Bundle D/C T/Line Sheikhupura – Ravi At SUPARCO Satellite Control Facility Kala Shah Kaku Lahore. | 2013 | M/s YU & Co. | 9.3 Million | Subcontractor M/s YU & Co. |
| 79 | 132KV Azad Pattan – Palandari Transmission Line | 2011 | NTDC / WAPDA | 25 Million | Main Contractor |
| 80 | Pile Foundation Works at 500kv Ghazi – Barotha Substation | 2013 | M/s CNEEC | 2 Million | Subcontractor M/s CNEEC |
| 81 | 500KV Guddu – Multan I/O at D.G Khan Substation. | 2014 | M/s CCPG | 180 Million | Subcontractor M/s CCPG |
| 82 | 132KV Hattian – Bagh T/Line Stringing Work | 2014 | M/s Potential | 4 Million | Subcontractor M/s Potential |
| 83 | 500kv Lahore – Gatti S/C T/Lines At 500kv Switchyard of CCPP Bhikki | 2016 | NTDC / WAPDA | 47.98 Million | Main Contractor |
| 84 | 500kv Yousafwala – Lahore S/C T/Lines At 500kv Switchyard of Sahiwal Coal P/Plant | 2017 | NTDC / WAPDA | 29.8 Million | Main Contractor |
| 85 | Rasing/Relocation of 04 No. 220KV T/L crossing Karachi –Lahore Motorway Abdul hakeem-Lahore Section III (Lot-I) | 2017 | NTDC / WAPDA | 14.98 Million | Main Contractor |
| 86 | 500KV Transmission Line from Port Qasim Power Plant To Interconnection with existing 500KV S/C Hub – Jamshoro T/Line. | 2017 | M/s ICC | 6.8 Million | Subcontractor M/s ICC |
| 87 | 500kv Neelum – Jhelum Transmission Line (Lot-II) | 2014 | M/s Potential | 126.27 Million | Subcontractor M/s Potential |
| 88 | 500kv 3RD Jamshoro – Moro – Dadu To Rahim Yar Khan T/Line (Jamhsoro – Moro Section) | 2015 | M/s CNEEC | 50 Million | Subcontractor M/s CNEEC |
| 89 | 500KV Gakhar – Lahore Transmission Line At New Lahore Substation. (Lot-IB) | 2016 | M/s CCPG | 175 Million | Subcontractor M/s CCPG |
| 90 | Contract No. 1/2019, Dated 19-02-2019 for Check Survey Work of D.I.Khan – Zhob 220KV Double Circuit – Energy Transmission Line | 2019 | M/s SA-RA | 6.5 Million | Subcontractor M/s SA-RA |
| 91 | 500KV T/Line Hubco Power Plant to Existing 500KV Jamshoro Grid Station | 2019 | M/s Potential | 48.22 Million | Subcontractor M/s Potential |
| 92 | 660KV Matiari – Lahore HVDC Transmission Line (Lot-I). | 2020 | M/s C.E.T | 200 Million | Subcontractor M/s C.E.T |